TANGA, TANZANIA · MANUFACTURING

Pee Pee Tanzania

Smart load-shedding through outages. Output up 40%.

1.25 MWp + 2.0 MWhSYSTEM Tanga, TanzaniaLOCATION

The brief.

PPTL’s Tanga plant combines a 1.25 MWp solar array with 2.0 MWh of storage and a power stabilisation system that does something clever during outages: prioritised load shedding. Critical lines keep running at full speed while deferrable loads wait their turn.

The smart integration paid off fast. Production was up 40% by July 2024, with the plant riding through grid events that used to cost whole shifts.

See it running.

Seamless power in Tanzania, with the Confederation of Tanzania Industries
Loading…
Email us Call +254 700 784 330