PLASTICS MANUFACTURING · KAMPALA, UGANDA

Two plants. Zero downtime.

East Africa’s leading maker of UPVC and HDPE pipes, tanks and floor tiles. Both Kampala plants solar-powered and stabilised.

2.6 MWp + 2.6 MWhHEADLINE RESULT Kampala, UgandaLOCATION
THE POWER PROBLEM

The challenge

Daily outages of one to four hours were stopping extrusion lines mid-run at the client’s Ntinda and Matugga plants. In plastics, a stopped line means scrapped product, not just lost time.

Voltage fluctuations were quietly adding to the wastage bill, while demand for irrigation equipment across Uganda, DRC, CAR and Sudan kept growing faster than the plants could reliably produce.

THE ARIYA FIX

The solution

Ariya built a 2.6 MWp solar PV system with 2.6 MWh of battery storage and full power stabilisation across both plants: 100% voltage and frequency correction, with genset integration and Vision Controller monitoring.

The plants now operate profitably from 9am to 4pm even when fully off-grid. Outages and fluctuations no longer decide the production schedule.

Impact & key figures.

2,600 kWpsystem size
2,250 kWPV inverter
2,300 kVAbattery inverter
2,600 kWhbattery storage
100%V & f correction
2plants powered
Visionremote monitoring
Yesgenset integration
9am to 4pmPROFITABLE OPERATION, FULLY OFF-GRID